INSTALLATION OF NINE AIR ASSISTED FLARE STACKS

  • image LOCATION Mina Al-Ahmadi Acid Gas Recovery Plant
  • image CLIENT Kuwait Oil Company (KOC)
  • image CONTRACT VALUE KD 6M (US$ 20M)
  • image Construction Period 2007-2010 (3 years)
  • DESCRIPTION

    Design, Procurement, Supply, Installation, Construction, Inspection, Testing, Pre-commissioning, Commissioning and Hand-over of new Tank Vapour (TV) and High Pressure (HP) Air Assisted Smokeless flares along with all the piping. Installation of the new flares, while utilizing the existing system, to provide standby flares for smokeless operation.

CONTACT

Moharafat General Contracting Company
Shuwaikh Industrial Area 3,
Block-B, Street 31, Building Number 255,
P . O. Box 2130 Safat, Kuwait.

Tel : +965 2292 9868
E-Mail : sales@moharafatcontractingco.com

ISO Certificate.

image